Despre instituție

European funded projects

I. EU - funded project - IN  EVALUATION
1. PEDESTRIAN ACCESS AND MOBILITY IN THE CENTRAL AREA OF CONSTANŢA MUNICIPALITY
Financing source

Regional Operational Programme 2014-2020 Priority axis 4, Investment priority 4e

Beneficiary

Administrative Territorial Unit Constanţa Municipality

General objective

The general objective of the project is the promotion of sustainable urbane mobility by the urban regeneration of the central area by a series of measures which lead to the increase of pedestrian accessibility and mobility in this area of the municipality. The aim of this project is to increase the modal share of moving by food and by bicycle, by transforming the segment of Ștefan cel Mare street in a modern pedestrian esplanade (sidewalks and shared-space areas), by rehabilitating the adjacent streets and by creating lanes dedicated to public transport and bicycle paths on Ferdinand Blvd. and Mircea cel Bătrân street. Moreover, the intention is to make the use of motor vehicles in the central area of the municipality less attractive. For this purpose, the access of personal/private motor vehicles in this area will be limited, which shall lead to the reduction of CO2 equivalent emissions.

Date for submitting the financing application

 28.03.2019
Suggested implementation period   28  months
   

2. IMPROVEMENT OF MOBILITY IN CONSTANŢA MUNICIPALITY, 1 MAI BLVD. –  ȘOSEAUA MANGALIEI ROAD AREA
Financing source

Regional Operational Programme 2014-2020 Priority axis 4, Investment priority 4e

Beneficiary

Administrative Territorial Unit Constanţa Municipality

General objective

The general objective of the project is to improve the urban mobility in Constanța Municipality, by a re-systematization of the transport infrastructure on 1 Mai Blvd. and Șoseaua Mangaliei Road. In order to encourage the use of more environment-friendly transport means, some lanes dedicated to public transport and to bicycles will be introduced and the roadway and sidewalks will be rehabilitated. The purpose of these interventions is mainly to reduce the GHG emissions and to promote sustainable urban mobility by making investments in the urban public transport infrastructure and in the infrastructure specific for travelling by foot and by bicycle, in order to ensure a free and safe movement of people. All these shall lead to the improvement of the environmental conditions and life quality for the citizens and visitors of Constanța Municipality.

Date for submitting the financing application

 28.03.2019
Suggested implementation period   28  months
   

3. IMPROVEMENT OF MOBILITY IN CONSTANŢA MUNICIPALITY, BETWEEN C.F.R. TRAIN STATION AND MAMAIA RESORT
Financing source

Regional Operational Programme 2014-2020 Priority axis 4, Investment priority 4e

Beneficiary

Administrative Territorial Unit Constanţa Municipality

General objective

The general objective of the project is to improve the urban mobility in Constanța Municipality, by a re-systematization of the transport infrastructure on 1 Decembrie 1918 Blvd. and Alexandru Lăpușneanu Blvd.  In order to encourage the use of more environment-friendly transport means, some lanes dedicated to public transport and to bicycles will be introduced and the roadway and sidewalks will be rehabilitated. The purpose of these interventions is mainly to reduce the GHG emissions and to promote sustainable urban mobility by making investments in the urban public transport infrastructure and in the infrastructure specific for travelling by foot and by bicycle, in order to ensure a free and safe movement of people. All these shall lead to the improvement of the environmental conditions and life quality for the citizens and visitors of Constanța Municipality.

Date for submitting the financing application

 28.03.2019
Suggested implementation period   28  months
   

4. INTEGRATED RECONDITIONING OF THE PEDESTRIAN AREA IN THE HISTORIC CENTRE OF CONSTANȚA MUNICIPALITY - STAGE II
Financing source

Regional Operational Programme 2014-2020 Priority axis 4, Investment priority 4e

Beneficiary

Administrative Territorial Unit Constanţa Municipality

General objective

The general objective of the project is the promotion of sustainable urbane mobility by the urban regeneration of the historic area of Constanța Municipality through a series of measures which lead to the increase of pedestrian mobility. Moreover, the intention is to make the use of motor vehicles in the historic centre of the municipality less attractive. Therefore, by rehabilitating some streets and by restricting the access for personal motor vehicles in this area of Constanța Municipality, the aim is to improve the sustainable urbane mobility, as well as to reduce the CO2 equivalent emissions.

Date for submitting the financing application

 28.03.2019
Suggested implementation period   36  months
   

5. REHABILITATION, MODERNISATION AND ENDOWMENT OF “MUGUREL” FULL-DAY KINDERGARTEN, CONSTANȚA
Financing source

Regional Operational Programme 2014-2020 - Axis 4/ Investment priority 4.4

Beneficiary

Administrative Territorial Unit Constanta Municipality

General objective

By rehabilitating, modernising and equipping “MUGUREL” full-day kindergarten of Constanța Municipality, the aim is to ensure that the educational activities intended for pre-school education are carried out in optimum conditions, at standards comparable with those of the European Union.

 

Date for submitting the financing application




20.03.2019 
Suggested implementation period  
33 months

6. REHABILITATION, MODERNISATION AND ENDOWMENT OF DIMITRIE LEONIDA TECHNOLOGICAL HIGH SCHOOL, CONSTANȚA
Financing source

Regional Operational Programme 2014-2020 - Axis 4/ Investment priority 4.5

Beneficiary

Administrative Territorial Unit Constanta Municipality

General objective

Rehabilitation, modernisation and endowment of C3 Building (canteen reconditioned into workshops) belonging to Dimitrie Leonida Technological High School of Constanța Municipality, in order to ensure that the educational activities intended for secondary education with a technological branch are carried out in optimum conditions, at standards comparable with those of the European Union.

 

Date for submitting the financing application




28.03.2019 
Suggested implementation period  
27 months

7. REHABILITATION, MODERNISATION AND ENDOWMENT OF TECHNOLOGICAL HIGH SCHOOL FOR ELECTRICAL ENGINEERING AND TELECOMMUNICATION, CONSTANȚA
Financing source

Regional Operational Programme 2014-2020 - Axis 4/ Investment priority 4.5

Beneficiary

Administrative Territorial Unit Constanta Municipality

 General objective Increase of the educational infrastructure relevant for the labour market in Constanța municipality, as determining factor for the increase of the educational process quality, early development of children, for building social skills and the social integration capacity. Modernisation of the technical education infrastructure and improvement of the material resources of the Technological High School for Electrical Engineering and Telecommunication, Constanţa.
 

Date for submitting the financing application




28.03.2019 
Suggested implementation period  
33 months

8. CULTURE FOR THE FUTURE
Financing source

Joint Operational Programme "Black Sea Basin" 2014-2020

Leader  Kameno Municipality - Bulgaria; 
   
Partners

Administrative Territorial Unit Constanța Municipality, together with entities from Bulgaria, Turkey, Georgia, Republic of Moldova;

General objective Strengthening the cooperation between the countries of the Black Sea Basin and improving the knowledge and communication between all relevant actors in the tourism sector, creating opportunities of stronger cross-border businesses in cultural tourism and increasing the attractiveness of the touristic sector by small scale investments, by using new technologies and interactive tools for promotion.

Date for submitting the financing application



05.02.2019
Suggested implementation period  
24 months

9. LISTEN – ENHANCE – ACKNOWLEDGE – REINFORCE – NETWORK (ACRONYM LEARN) 
Financing source

Joint Operational Programme "Black Sea Basin" 2014-2020

Leader  Administrative Territorial Unit Constanța Municipality;
   
Partners Entities from Bulgaria, Republic of Moldova, Romania;
   
General objective Continuous promotion of businesses and entrepreneurship in the tourism and culture sectors.

Date for submitting the financing application



05.02.2019
Suggested implementation period  
24 months

10. PUBLIC AWARENESS AND INTELLIGENT INFORMATION TECHNOLOGY TO FACE FLOODS, STORM SURGES AND URBAN WILDFIRES IN COASTAL CITIES (ACRONYM PANACEA)
Financing source

Joint Operational Programme "Black Sea Basin" 2014-2020

Leader  Aristotle University of Thessaloniki, Greece;
   
Partners Administrative Territorial Unit Constanța Municipality, together with entities from Ukraine and Bulgaria;
   
General objective Elaboration of a method to identify and quantify risks in coastal areas and to provide a warning framework for inhabitants and tourists by using smart communication technologies.

Date for submitting the financing application



05.02.2019
Suggested implementation period  
30 months

11. ENHANCING CULTURAL HERITAGE POTENTIAL TO DRIVE CHANGE IN  EU CITIES  (ACRONYM CITYNEXT)
Financing source

HORIZON 2020  SC5-20-2019

Leader  Obshtina Burgas Municipality 
   
Partners Administrative Territorial Unit Constanța Municipality, together with entities from Bulgaria, Italy, Hungary, Greece;
   
General objective Enhancement of the cultural and historic heritage potential in order to stimulate sustainable growth of cultural and creative industries in European cities, by innovative approaches of urban planning.

Date for submitting the financing application



19.02.2019
Suggested implementation period  
60 months

12. PROCESS REMODELING AND OPTIMIZATION THROUGH OPENING UP CITY SERVICE DELIVERY  (ACRONYM PRO-CITY)
Financing source

HORIZON 2020 - H2020-SC6-TRANSFORMATIONS-2018-2019-2020

Leader  Aarhus Universitet, Holland
   
Partners Administrative Territorial Unit Constanța Municipality, together with entities from Belgium, Germany, United Kingdom, Spain, Finland, Holland, Denmark, Bosnia-Herzegovina, Greece
   
General objective Sharing knowledge on the real impact versus the expected impact of introducing the disruptive technologies in the provision of public services for the city, as well as testing some new processes of improvement of the public services provision.

Date for submitting the financing application



14.03.2019
Suggested implementation period  
36 months

13. DEVELOPMENT OF INNOVATIVE SUSTAINABLE TOURISM POLICIES IN THE DANUBE AREA BASED ON THE CREATIVE TOURISM EXPERIENCE POTENTIAL (ACRONYM CREATIVE RECREATION)
Financing source Danube Transnational Programme 2014-2020
Leader  Business Support Centre for Small and Medium Enterprises-Ruse, Bulgaria;
   
Partners Administrative Territorial Unit Constanța Municipality, together with entities from Slovenia, Hungary, Croatia, Bulgaria, Romania, Czech Republic, Austria, Serbia, Bosnia and Herzegovina, Republic of Moldova;
   
General objective Promoting the development of touristic potential for a sustainable ecological touristic product, with a higher added value from the creative industries; Stimulating and strengthening the cohesion between the various countries in the Danube region; Encouraging forms of ecological tourism, for the conservation and sustainable use of the natural and cultural heritage, as well as the resources.

Date for submitting the financing application



07.03.2019
Suggested implementation period  
30 months

14. BLACK SEA HUB FOR SUSTAINABLE TOURISM (ACRONYM  BESTHub) 
Financing source Joint Operational Programme "Black Sea Basin" 2014-2020
Leader  Komotini Municipality, Grecia
   
Partners Administrative Territorial Unit Constanța Municipality, together with entities from Bulgaria and Ukraine;
   
General objective Setting up a sustainable network for promoting the tourism development in the Black Sea region by using the common resources in the field of culture and tourism.

Date for submitting the financing application



05.02.2019
Suggested implementation period  
28 months

15. DEVELOPING CULTURAL AND CREATIVE INDUSTRIES IN THE BLACK SEA BASIN (ACRONYM CREA – CENTERS )
Financing source Joint Operational Programme "Black Sea Basin" 2014-2020
Leader  Cekmekoy Municipality – Turkey ;
   
Partners

Administrative Territorial Unit Constanța Municipality, together with entities from Greece, Bulgaria and Ukraine;

General objective

Setting up and developing structures and networks for designers, entrepreneurs, academicians and artists operating in the field of cultural and creative industries in the Black Sea Basin.


Date for submitting the financing application



01.02.2019
Suggested implementation period  
24 months

16. BOOSTING THE INNOVATIVE POTENTIAL OF TOURISM SMEs AND CREATIVE INDUSTRIES IN URBAN LEVEL (ACRONYM BLACK SEA RESTO)
Financing source Joint Operational Programme "Black Sea Basin" 2014-2020
Leader  International Research and Education Centre for Agrobusiness, Armenia;
   
Partners

Administrative Territorial Unit Constanța Municipality, together with entities from Greece, Turkey and Armenia;

General objective

The enterprises in the gastronomic sectors will elaborate and develop common approaches for marketing and selling their products;


Date for submitting the financing application



05.02.2019
Suggested implementation period  
26 months

17. PARTICIPATORY AIR POLUTTING MONITORING IN  BLACK SEA  (ACRONYM PAPMON)
Financing source Joint Operational Programme "Black Sea Basin" 2014-2020
Leader  Bolu Municipality, Turkey;
   
Partners

Administrative Territorial Unit Constanța Municipality, together with entities from Bulgaria and Georgia;

General objective

Introducing some services to monitor the ozone concentrations and emissions reduction in the context of air pollution;


Date for submitting the financing application



30.01.2019
Suggested implementation period  
24 months

18. CITIES RAISE AWARENESS OF AND MOBILISE CITIZENS ABOUT SUSTAINABLE ENERGY AND CLIMATE CHANGE IN THE CONTEXT OF THE EU COVENANT OF MAYORS INITIATIVE AND BEYOND (ACRONYM CITIZENS ADAPT)
Financing source DEAR
Leader  DIMOS VARIS-VOULAS-VOULIAGMENIS, Greece;
   
Partners Administrative Territorial Unit Constanța Municipality, together with entities from Latvia, Greece, Slovakia, Hungary, Spain, Portugal, Italy, Cyprus, France;
   
General objective

Strengthening the knowledge, participation and commitment of EU citizens in the fight against climate changes and environment degradation, in order to contribute to a behavioural change towards sustainable life models.

Date for submitting the financing application



11.02.2019
Suggested implementation period  
36 months

19. REHABILITATION OF THE MIHAI EMINESCU NATIONAL COLLEGE BUILDING
Financing source Ministry of Culture and National Identitity
Leader  Administrative Territorial Unit Constanța Municipality;
   
Partners -
   
General objective

Boosting the local development by conservation, protection and valorisation of the cultural heritage and cultural identity.

Date for submitting the financing application

24.10.2018
Suggested implementation period  48 months

20. RESTORATIN OF THE MUSEUM OF POPULAR ARTS, CONSTANȚA
Financing source Ministry of Culture and National Identitity
Leader  Administrative Territorial Unit Constanța Municipality;
   
Partners -
   
General objective

Boosting the local development by conservation, protection and valorisation of the cultural heritage and cultural identity.

Date for submitting the financing application

24.10.2018
Suggested implementation period 48 months

21. RECHARGING STATIONS FOR ELECTRIC VEHICLES IN CONSTANTA MUNICIPALITY
Financing source Environmental fund administration – „The programme regarding reducing green house gas emision in transports through promoting the infrastructure for non poluting vehicles in terms of energy: electric vehicle charging in all county capital "
   
Beneficiary

Administrative Territorial Unit Constanţa Municipality


   
General objective

To reduce the green house gas emision generated by vehicle traffic by developing the infrastructure for electric charging by mouting 18 vehicle electric charging stations.

Date for submitting the financing application

09.01.2019
Suggested implementation period 12 months

II. EU - funded project - STAGE precontracting/CONTRACT
1. “REHABILITATION, MODERNISATION AND ENDOWMENT OF “AMICII” FULL-DAY KINDERGARTEN, CONSTANȚA”
Financing source

Regional Operational Programme 2014-2020 - Axis 4/ Investment priority 4.4

Beneficiary

Administrative Territorial Unit Constanţa Municipality

General objective 

By rehabilitating, modernising and equipping “AMICII” full-day kindergarten of Constanța Municipality, the aim is to ensure that the educational activities intended for pre-school education are carried out in optimum conditions, at standards comparable with those of the European Union

Date for submitting the financing application 


18.03.2019
Suggested implementation period  
33 months

2. “INCREASE OF ENERGY EFFICIENCY OF THE CONSTANȚA STATE THEATRE BUILDING”
Financing source

Regional Operational Programme 2014-2020 - Axis 3/ Investment priority 3.1.B -SUERD/1

Beneficiary

Administrative Territorial Unit Constanţa Municipality

General objective

Increase of the energy efficiency for the building where the Constanța State Theatre operates, by implementing a set of measures designed to optimize the energy consumption of the building and alignment to the European performance standards and requirements.

Date for submitting the financing application
29.06.2018
Suggested implementation period  
33 months

3. “INCREASE OF ENERGY EFFICIENCY OF THE 38 SECONDARY SCHOOL BUILDING, DIMITRIE CANTEMIR, CONSTANȚA”
Financing source

Regional Operational Programme 2014-2020 - Axis 3/ Investment priority 3.1.B -SUERD/1

Leader

Administrative Territorial Unit Constanţa Municipality

Partners

Increase of the energy efficiency for the building where the 38 Secondary School, Dimitrie Cantemir of Constanța Municipality operates, by implementing a set of measures designed to optimize the energy consumption of the building and alignment to the European performance standards and requirements.

Date for submitting the financing application 29.06.2018
Suggested implementation period  33 months

4. INCREASE OF ENERGY EFFICIENCY OF THE 17 SECONDARY SCHOOL BUILDING, ION MINULESCU, CONSTANȚA
Financing source

Regional Operational Programme 2014-2020 - Axis 3/ Investment priority 3.1.B -SUERD/1

Beneficiary

Administrative Territorial Unit Constanta Municipality

General objective

Increase of the energy efficiency for the building where the 17 Secondary School, Ion Minulescu of Constanța Municipality operates, by implementing a set of measures designed to optimize the energy consumption of the building and alignment to the European performance standards and requirements.

Date for submitting the financing application
29.06.2018 
Suggested implementation period  
33 months

5. INCREASE OF ENERGY EFFICIENCY OF THE 8 SECONDARY SCHOOL BUILDING, CONSTANȚA
Financing source

Regional Operational Programme 2014-2020 - Axis 3/ Investment priority 3.1.B -SUERD/1

Beneficiary

Administrative Territorial Unit Constanta Municipality

General objective

Increase of the energy efficiency for the building where the 8 Secondary School of Constanța operates, by implementing a set of measures designed to optimize the energy consumption of the building and alignment to the European performance standards and requirements.

Date for submitting the financing application
29.06.2018 
Suggested implementation period  
33 months

6. EXCELLENCE IN THE SOUTH EAST EUROPE PUBLIC SECTOR
Source of funding 

2014-2020 EEA and Norwegian Grants

Leader

Nestos Municipality, Greece

Parteners

Constanta Municipality Administrative Territorial Unit, together with entities from Bulgaria, Ukraine, Albania, The Republic of Moldova, Turkey.

General objective Improving the administrative capacity of the public sector in the program area by implementing modern quality management tools.

Grant application submission date 
 
30.06.2018
Proposed implementation duration  
24 months

Stage
 
In technical-financial evaluation

7. DISSEMINATION OF GOOD PRACTICES IN MUNICIPAL PUBLIC RELATIONS
Source of funding 

The twinning between Turkey and the EU grant scheme (TTGS)

Leader

Istanbul Metropolitan Area, Turkey

Parteners

Constanta Municipality Administrative Territorial  Unit , together with entities from Turkey, Sweden, Switzerland, Hungary, Croatia, Poland.

General objective Creating partnerships between the cities of Istanbul, Dubrovnik, Warsaw, Constanta and Budapest in order to improve the services provided to the inhabitants by the local authorities.

Grant application submission date 
 
06.11.2018
Proposed implementation duration  
12 months

Stage
 
In technical-financial evaluation

III. EU - funded project - IN IMPLEMENTATION
1. BUSINESS INCUBATOR CONSTANȚA
Financing source

Regional Operational Programme 2014-2020 - Axis 2.1B

Beneficiary Administrative Territorial Unit Constanța Municipality 
   
Partners

Chamber of Commerce, Industry, Navigation and Agriculture Constanţa
Intercommunity Development Association "Constanța Metropolitan Area "

General objective

Consists in creating a sectoral business incubator, intended for the sector of creative industries, in a building having the height capacity S+P+4E+M [*basement + ground floor + 4 floors + attic], located in Constanța Municipality, aiming to become the first regional hub for the entrepreneurial community involved in the sector of creative industries in the South – East region and to contribute to the growth of the regional competitiveness, to the generation of innovation and new skilled employment with competitive pay. The incubator shall provide high quality support services for the incubated companies and shall create mechanisms facilitating the transfer of experience, know-how and knowledge specific to successful business development, both by the new entrepreneurs of the creative industries, as well as by the entire entrepreneurial community in the South – East region.
Suggested implementation period
48 months

2. REHABILITATION OF 16 SECONDARY SCHOOL "MARIN IONESCU DOBROGIANU"
Financing source

Regional Operational Programme 2014-2020 - Axis 10

Beneficiary Administrative Territorial Unit Constanța Municipality 
   

General objective

The general objective of the project is to improve the quality of the educational infrastructure, namely the rehabilitation, modernisation, extension and endowment of 16 Secondary School “Marin Ionescu Dobrogianu” of Constanța in order to ensure an educational process at European standards, an increase of the participation of school population and adults to the educational process.
Date for submitting the financing application 
08.05.2018 
Suggested implementation period
34 months

3. JOINT ROMANIAN - BULGARIAN CULTURAL AND HISTORICAL HERITAGE – MINIATURE PARK (Acronym MINI RO-BG)
Financing source

INTERREG V-A Romania-Bulgaria

Beneficiary Administrative Territorial Unit Constanța Municipality
   
Partners  NGO European Institute for Cultural Tourism EUREKA (EICT EUREKA), Bulgaria 

General objective

Improvement of the sustainable use of the natural and cultural heritage.

Date for submitting the financing application  16.10.2017
   
Suggested implementation period 36 months

IV EU-FUNDED PROJECTS - IN IMPLEMENTATION, THE PROJECT SHALL BE INTRODUCED

1. “INCREASE OF ENERGY EFFICIENCY OF THE OVIDIUS THEORETICAL HIGH SCHOOL BUILDING, CONSTANTA.”
Financing source

Regional Operational Programme 2014-2020 - Axis 3/ Investment priority 3.1.B

Beneficiary

Administrative Territorial Unit Constanţa Municipality

Financing contract

2897/16.08.2018

General objective

Increase of the energy efficiency for the building where the Ovidius Theoretical High School of Constanța operates, by implementing a set of measures designed to optimize the energy consumption of the building and alignment to the European performance standards and requirements.

Total value of the project

10,350,870.72 lei

Value of eligible co-financing (2%)

205,650.53 lei

Suggested implementation period 

16.08.2018-20.11.2020


2. ALTERNATIVE BUILDING ACTIVATION UNITS (ACRONYM ALT/BAU)
Financing Source

URBACT III Program - Transfer Networks Phase II

Leader
City of Chemnitz, Germany;
   

Partners

Administrative Territorial Unit Constanța Municipality, together with entities from Poland, Latvia, Belgium, Spain, Italy;

Total value of the project 595.000 euro /network (stage I + stage II)
   
Partner value

44.715 euro, out of which:

Administrative Territorial Unit 

- ERDF contribution 38.007,75 euro (85%);

   
Constanța Municipality   - Local co-funding 894.30 euro (2%);
   
Implementation period

17.02.2018 - 05.12.2020

   

General objective

Revitalisation of vacant and degraded historical buildings, by a proactive approach of connection to the public administrations, owners, investors and users.
   
Results  Experience and good practices exchange at transnational level. 

3. "WIFI4 EU PROMOTION OF INTERNET CONNECTIVITY IN LOCAL COMMUNITIES" OF CONSTANȚA MUNICIPALITY
Financing Source

Free Wi-Fi for Europeans Programme;

Financing contract   INEACEF/WiFi4EU/1/2018/010009-013149; 
Leader
Administrative Territorial Unit Constanța Municipality;
   
Total value of the project 15.000 euro (voucher);
   
Implementation period

19.12.2018-19.06.2020

   

General objective

The initiative WiFi4EU promotes free access to Wi-Fi in public areas such as parks, squares and public buildings, libraries, health care centres and museums, in the entire EU. The initiative provides for the municipalities the possibility to apply for a 15 000 EURO voucher. 
   
Results  Installation of new Wi-Fi networks in order to provide free access to Wi-Fi in public areas.

4. SMART CT
Financing Source

Project co-financed by the din European Social Fund, through the Operational Programme Administrative Capacity 2014-2020

MYSMIS code/ project code MySMIS 2014: 126409/ SIPOCA 551 
   
Beneficiary
Administrative Territorial Unit Constanța Municipality
   
Total value of the project Total eligible value of the project – 3,618,486.48 lei;
Eligible co-financing of the beneficiary – 72,369.73 lei (2%);
Non-refundable eligible amount from ESF – 3,075,713.52 lei;
Non-refundable eligible amount from national budget- 470,403.23 lei;
   
Implementation period

05.12.2018 - 04.05.2021 

   

Objectives

The general objective consists in strengthening the administrative capacity of the Administrative Territorial Unit Constanța Municipality by developing the strategic planning capacity and by simplifying the administrative procedures, in correlation with the introduction of electronic methods for the management of administrative documents.                         

Specific objectives
Specific objective 1 -  Development of the strategic planning capacity at the level of the local public administration of Constanţa Municipality by crating the Smart City Strategy for the municipality;
Specific objective 2 – Increasing the efficiency and simplifying the services provided for citizens by implementing a portal of digital services for citizens, documents management, ERP and partial digitalization of the archive;
Specific objective 3 -  Promoting modernisation I nteh local public administration of Constanţa Municipality by specialising the city hall employees on topics specific to the project (strategic planning), which shall motivate and drive them towards innovation and providing quality public services for citizens. 

Results 

– the Smart City Strategy of the a municipality is elaborated
– the analysis – diagnostic of the computer and document management system;
– developed and implemented integrated computer system;
– electronic archive for at least 1600 linear meters of physical archive;
– 10 persons trained in the field of strategic planning.


5. CERTOUR II: FOR A BETTER SME MANAGEMENT (ACRONYM CERTOUR II)
Financing Source

Joint Operational Programme "Black Sea Basin" 2014-2020

Leader Technical Chamber of Greece - Eastern Macedonia Branch; 
   
Partners
Administrative Territorial Unit Constanța Municipality  together with entities from Ukraine, Turkey, Armenia, Greece;
   

Total value of the project

827,860 euro; 

Partner value
Administrative Territorial Unit Constanța Municipality

- Total eligible value: 156,562 euro;
- Non-refundable eligible amount from ENI: 144,037.04 euro (92%);
- Eligible co-financing: 12,524.96 euro (8%);

Implementation period

11.10.2018 - 10.10.2020

Objectives

Improvement of the management and persons working in the SMEs in the field of tourism; 

Results 

Building an integrated platform for the management of SMEs with the support of mentors register, management tools and e-training platform.


6. DEVELOPMENT OF SUSTAINABLE CULTURAL TOURISM IN THE BLACK SEA BASIN (ACRONYM CULTOUR-BSB)
Financing Source

Joint Operational Programme "Black Sea Basin" 2014-2020

Leader Sozopol Municipality, Bulgaria;
   
Partners
Administrative Territorial Unit Constanța Municipality  together with entities from Georgia, Ukraine, Turkey;
   

Total value of the project

957,792.24 euro 

Partner value
Administrative Territorial Unit Constanța Municipality

- Total eligible value:  118,169 euro;
- Non-refundable eligible amount from ENI: 108,715.48 euro;
- Eligible co-financing: 9,453.52 euro (8%);

Implementation period

11.09.2018 - 10.08.2020 

Objectives

Joint development and promotion of cross-border business opportunities in the field of tourism, with an emphasis on the cultural segment of the Black Sea basin market. 

Results 

A joint strategy for the promotion of transnational tourism.


7. MULTI-MODAL OPTIMISATION FOR ROAD-SPACE IN EUROPE (ACRONYM MORE)
Financing Source

HORIZON 2020 - MG-7-2-2017 ;

Leader

UNIVERSITY COLLEGE OF LONDON , United kingdom;

Partners
Administrative Territorial Unit Constanța Municipality  together with entities from Germany, France, Holland, United kingdom, Belgium, Czech Republic, Hungary, Romania, Portugal, Sweden;

Total value of the project

5.537.113.75 euro

Partner value
Administrative Territorial Unit Constanța Municipality

- Total eligible value:  194,375 euro;
- Integral financing from the European Commission;

Implementation period

01.09.2018 - 31.08.2021

Objectives

Ensuring a comprehensive and objective approach for planning, designing and operating the road territory on the corridors of the international roads network TEN-T; 

Results 

5 Strategies for a better allocation of the road territory for the roads making the connection with the TEN-T European network.


8. INCREASING THE ADMINISTRATIVE CAPACITY OF CONSTANȚA MUNICIPALITY BY IMPLEMENTING MEASURES IN THE FIELD OF ANTICORRUPTION 
Financing Source

“Project co-financed by the European Social Fund, through the Operational Programme Administrative Capacity 2014-2020”

MySMIS code/ project code 

MySMIS 116521/ SIPOCA 405 

Beneficiary  Administrative Territorial Unit Constanța Municipality; 
   

Total value of the project

Total eligible value of the project – 292,955.70 lei;
Eligible co-financing of the beneficiary – 5,859.11 lei;
Non-refundable eligible amount from ESF – 249,012.35 lei;
Non-refundable eligible amount from national budget – 38,084.24 lei;

Implementation period

23.07.2018 - 23.11.2019




Objectives

General objective
Elaborating an anticorruption operational procedure, of a guide/manual of good practices of ethics and integrity and training the staff of the Constanţa City Hall in order to enforce the corruption prevention measures. 

Specific objectives
Specific objective 1 -  Elaborating a guide/ operational procedure on corruption and the necessary measures to prevent it;
Specific objective 2 - Elaborating a campaign for the education of anticorruption behaviour;
Specific objective 3 -  Training the employees of the Constanţa City Hall in the field of anticorruption, ethics and integrity (40 persons).

Results 

- Guide /manual of good practices, standards of ethics and integrity;
- Elaborated operational procedure;
- Anticorruption education campaigns;
- 40 persons from the Constanța City Hall who were certified at the end of the courses in the field of corruption prevention, transparency, ethics and integrity.


9. INCREASING THE ADMINISTRATIVE CAPACITY OF CONSTANȚA MUNICIPALITY BY IMPLEMENTING AND MAINTAINING THE QUALITY MANAGEMENT SYSTEM ISO 900 
Financing Source “Project co-financed by the European Social Fund, through the Operational Programme Administrative Capacity 2014-2020”
MySMIS code/ project code 

MySMIS 109686/SIPOCA 122

Beneficiary  Administrative Territorial Unit Constanța Municipality
   

Total value of the project

Total eligible value of the project – 422,917.67 lei;
Eligible co-financing of the beneficiary – 8,458.35 lei;
Non-refundable eligible amount from ESF – 359,480.02 lei;
Non-refundable eligible amount from national budget – 54,979.30 lei;

Implementation period

25.06.2018 - 24.10.2019




Objectives

General objective – Implementation and certification of the quality management system in accordance with the provisions of the standard SR EN ISO:2015.
Specific objectives
Specific objective 1 – Reviewing and optimisation of the internal work flows;
Specific objective 2 – Implementing the  quality management system in accordance with the provisions of the standard SR EN ISO 9001:2015;
Specific objective 3 – Promoting modernisation in the local public administration of Constanța Municipality, by specialising the City Hall employees on topics specific to quality management (551 persons).

Results 

- Quality management system ISO 9001 implemented in the City Hall of Constanța Municipality;
- Staff of the local public administration of Constanța municipality trained on topics specific to quality management in public administration.


10.  INTEGRATED MEASURES FOR A BETTER LIFE
Financing Source POCU 2014-2020 (Operational Programme Human Capital) - Operation 4.1 
Beneficiary  Administrative Territorial Unit Constanța Municipality
   
Partener "Decebal” Theoretical High School 
   

Total value of the project

10,854,192.75 lei;
Total eligible value of the project – 10,788,092.75 lei;
Eligible co-financing of the beneficiary – 179,991.86 lei;
Non-eligible expenses- 66,100.00 lei;

Implementation period

16.02.2018 -  15.02.2021

   

General objective

Reducing the number of persons at risk of poverty or social exclusion from the studies marginalised community where there is Rroma population, by supporting the social and economic integration of 600 persons from the marginalised community residing in the intervention area which includes the "Henri Coandă" social campus as well.

Results 

-  Integrated social services, medical and medico-social services
-  Supporting access and participation to education;
-  Support or access and/or maintaining on the labour market;
-  Supporting entrepreneurship and employment on one’s own;
-  Improvement of living conditions.


11. SNAPSHOTS FROM THE BORDERS – SMALL TOWNS FACING THE GLOBAL CHALLENGES OF AGENDA 2030
Financing Source

DEAR (Development Education and Awareness Raising;

Beneficiary 

Comuni Di Lampedusa E Linosa, Italy;

   
Partener

Administrative Territorial Unit Constanța Municipality, together with entities from Romania, Italy, Austria, Hungary, Greece, Germany, Slovenia, Bosnia - Herzegovina, Cyprus, Bulgaria, France, Sweden, Spain, Malta;

   

Total value of the project

5.352.358,28 euro

Partener value 

60.429,20 euro, din care:
- Non-refundable eligible value: 54,159,65 euro
-Eligible co-financing: 6,272.55 euro (10,38%) 

Implementation period  21.10.2017-20.10.2020 

General objective

Improvement of critical understanding of the European, national and local decision-makers, as well as of the public opinion regarding the migration determined by the European border flows.

Results 

Increased number of European citizens informed on global migration and on key factors which determine migration and a high understanding from the local decision-makers regarding the key factors determining the migration flows;
The "Border cities network" shall be built as an innovative tool in order to develop itself horizontally.


12. PORT - CITIES: INNOVATION FOR SUSTAINABILITY (ACRONYM PORTIS)
Financing Source

Horizon 2020 -  MG.5.5 – 2015;

Beneficiary 

City of Anvers, Belgium;

   
Partener

Administrative Territorial Unit Constanța Municipality, together with 33 entities from 33 the Consortium: Belgium, Scotland, Italy, Lithuania, China;
The local partnership in Constanța is made of:
Administrative Territorial Unit Constanța Municipality – local coordinator;
National Company “Maritime Ports Administration” Constanța;
Intercommunity Development Association "Constanța Metropolitan Area";
“Ovidius” University of Constanța;
MedGreen Cluster Association;
European Centre for Development;
European Integrated Project, Bucureşti.

   

Total value of the project

17,678,400.00 euro

Partner value
Administrative Territorial Unit Constanța Municipality 

476,078 euro
- Non-refundable eligible value: 476,078 euro;

Implementation period 

01.09.2017 - 31.08.2020 

General objective

Innovative solutions on the manner in which the mobility and accessibility measures are used to increase the functional and social cohesion between the city and the port.  

Results 

Improvement of the governance for an increased cooperation between cities and ports, creating a more sustainable and healthier city-port environment, creating an integrated transport infrastructure and mobility system, increasing the efficiency of the urban passenger and freight transport.


V. CROSS-BORDER PROJECTS - FINISHED

1. BLACK SEA BIKE - DIVERSIFICATION OF THE TOURISM SERVICES IN CONSTANTA - BALCHIK CROSS BORDER REGION BY BIKE - BSB
Financing source

Operational Programme for Cross-border Cooperation Romania-Bulgaria 2007-2013;

Beneficiary Administrative Territorial Unit Constanța Municipality; 
Partner Balchik Municipality (Bulgaria);
Financing contract  34544/26.04.2013

Total eligible value of the project 

1,498,533.24 euro

Value from the Administrative Territorial Unit Constanța Municipality 

1,180,618.24 euro, out of which:
- own co-financing: 25,737.48 euro (2,18%); 

Completion date   15.09.2016; 
Objective

Diversification of the touristic services by creating a network of bicycle stations in the cities of Constanța and Balchik.

Results

24 bicycle stations Constanța Municipality, 6 bicycle stations in Balchik.
390 bicycles purchased for Constanța Municipality and 100 bicycles purchased for Balchik Municipality, which shall be provided for the users free of charge.


VI. FINISHED PROJECTS
1. PARTNERSHIP – ACTION PLAN REGARDING AIR QUALITY
Financing source

European Commission / Government of Netherlands 

Partners 

Member states: Netherlands (coordinator), Croatia, Sweden;
Cities: London, Utrecht, Milan, Constanța;
European institutions: European Commission, Eurocities, Urbact, Joint Research Centre

Financing contract Volunteer participation
Implementation period 26.03.2016-15.03.2019
Project completion date 15.03.2019
Objective Identification of issues regarding the air quality and the impact on health, especially in the urban area. The partnership is part of the Urban Agenda of the European Union and implies an exchange of information and good practices between partner states.
Results

Result 1: Establishing the information regarding the air quality and the influence on health – situations specific to each city;
Result 2: Identification of the financing sources and the regulations on air quality in order to establish the contradictions / lacks / specific examples in the legislation;
Result 3: Presenting examples of good practices in the field of air quality;
Result 4: Elaborating a Guide for cities that want to create an action plan regarding air quality. This Guide shall include the best examples of both legislation and implemented actions.(coordinator Constanṭa and Milan).


2. “REHABILITATION AND MODERNISATION OF PUBLIC LIGHTING IN SOME LOCALITIES OF THE CONSTANŢA METROPOLITAN AREA.”

Financing source

Regional Operational Programme 2007-2013 - Axis 1.1.

Beneficiaries

Administrative Territorial Unit Constanţa Municipality

Financing contract

5052/27.02.2015

Total value of the project

32,296,166.58 lei, out of which 31,461,099.79 lei non-refundable amount

Implementation period

28.02.2015-31.10.2016

Project completion date

31.10.2016


3. “IMPROVEMENT OF THE ACCESS BETWEEN CONSTANȚA MUNICIPALITY AND NĂVODARI INDUSTRIAL PLATFORM BY WIDENING AND MODERNISING THE MAMAIA-NĂVODARI BOULEVARD”

Financing source

Regional Operational Programme 2007-2013 - Axis 1.1.

Beneficiaries

Administrative Territorial Unit Năvodari
Administrative Territorial Unit Constanţa Municipality

Financing contract

3535/04.12.2012

Total value of the project

57,943,411.05 lei  

Implementation period

05.12.2012-01.11.2016

Project completion date

01.11.2016

Objectives

 

Improvement of the access between Constanța Municipality and Năvodari industrial platform by widening and modernising the Mamaia-Năvodari Boulevard, development and valorisation of the economic potential of the area, increase of the accessibility level of the city of Năvodari in order to valorise the touristic potential of the area and increasing its role in the development of Constanța County. 

Results

Rehabilitated and modernised urban streets – 6,3 km. 

4. “IMPROVEMENT OF THE ACCESS BETWEEN CONSTANȚA MUNICIPALITY AND NĂVODARI INDUSTRIAL PLATFORM BY WIDENING AND MODERNISING THE MAMAIA-NĂVODARI BOULEVARD”

Financing source

Regional Operational Programme 2007-2013 - Axis 1.1.

Beneficiaries

Administrative Territorial Unit Constanţa Municipality

Financing contract

3337/17.08.2012

Total value of the project

4,849,595.99  lei, out of which 3,716,384.73 lei non-refundable amount

Implementation period

18.08.2012-01.11.2016

Project completion date

01.11.2016

Objectives

 

Rehabilitation works for the retirement home and its extension by a new building P+2E [*ground floor + 2 floors] having the functions of administrative areas, accommodation areas, medical practice areas, socialisation area, storage areas.

Results

The accommodation capacity has been increased by 48 seats, out of which 28 seats in the new building and 20 seats created as a result of the fact that the offices and medical practices were moved from the old accommodation building in the new building, in the rooms having this destination.

5. BUILDING A MULTILEVEL PARKING P+7E+T [*GROUND FLOOR + 7 FLOORS + TERRACE]‚ IN MAMAIA RESORT, CASINO-ALBATROS AREA”

Financing source

Regional Operational Programme 2007-2013 - Axis 1.1..

Beneficiaries

Administrative Territorial Unit Constanţa Municipality

Financing contract

3767/18.07.2013

Total value of the project

14,281,544.79 lei, out of which  13,995,913.89  lei non-refundable amount

Implementation period

2013-2016

Project completion date

30.06.2016

Objectives

 

Development of the urban public infrastructure in order to modernise the public services in general and the touristic services in special, by building a multilevel parking P+7E+T in Mamaia Resort, Casino-Albatros area.

Results

394 new parking spaces

6. INTEGRATED MEASURES FOR EQUALITY OF CHANCES

Financing source

Sectoral Operational Programme Human Resources Development 2007-2013 - Axis 6 “Promoting social inclusion”

Beneficiary

Administrative Territorial Unit Constanța Municipality

Partners

“Ovidius” University of Constanța and the Institute for Human Resources Development

Financing contract

Sectoral Operational Programme Human Resources Development no. 146/6.3/G/130592/29.04.2014

Contract value

1,990,385 lei

Implementation period

30.04.2014 - 15.12.2015

Project completion date

 

15.12.2015

Objective  Facilitating access on the labour market for vulnerable groups (women) and building a professional career in the context of promoting an inclusive society for the welfare of women in the urban and rural environment of the South – East region. 
   

Results

588 women trained/qualified through the following courses: human resources inspector, trade worker, baby-sitter, English language and social and civic skills.
web-site: www.egalitate-de-sanse.ro

7. MAMAIA TOURIST PROMENADE

Financing source

Regional Operational Programme 2007-2013–Axis 1.1.

Beneficiary

Administrative Territorial Unit Constanța Municipality

Financing contract

3348/17.08.2012

Contract value

68,685,880.49 lei, out of which 48,317,628.50 lei non-refundable amount

Implementation period

August 2012 - August 2015

Project completion date

 

17.08.2015 

Results

Modernisation and restoration of the tourist promenade of Constanţa Municipality – Vacation Village area and Mamaia Resort:
Rehabilitation of the main pedestrian alley of the Vacation Village;
Rehabilitation and restoration of Perla plaza; 
Rehabilitation and restoration of Malibu – Perla – Mamaia Casino promenade; 
Rehabilitation and modernisation of Mamaia Casino promenade and plaza; 
Rehabilitation and restoration of Club Castel Casino promenade – up to the vicinity of Vega hotel;
1,090 new parking spaces and 126,102 m2 of restored and furnished promenade (benches, garbage cans, lighting poles etc.).


8. INTEGRATED RESTORATION OF THE PEDESTRIAN AREA IN THE HISTORICAL CENTRE OF CONSTANŢA MUNICIPALITY

Financing source

Regional Operational Programme 2007-2013–Axis 1.1.

Beneficiary

Administrative Territorial Unit Constanța Municipality

Financing contract

3034/10.05.2012 

Contract value

37,934,638.30 lei out of which 29,807,506.65 lei non-refundable amount

Implementation period

2012-2015

Project completion date 

10.06.2015 

Results

Rehabilitation of the urban infrastructure in the historical centre of Constanţa Municipality by: Rehabilitating a number of 21 streets in the Peninsular area of Constanţa Municipality; Creating/ rehabilitating the rain water sewerage system associated with the rehabilitated streets; Providing urban furniture for the area: lighting poles, road signs, garbage cans, ashtrays.


9. “RESTORATION AND REARRANGEMENT OF THE PROMENADE AND GREEN AREAS IN THE VRAJA MĂRII – CASINO – TOMIS PORT AREA”

Financing source

Regional Operational Programme 2007-2013–Axis 1.1.

Beneficiary

Administrative Territorial Unit Constanța Municipality

Financing contract

3030/10.05.2012 

Total value of the project

12,370,510.26 lei, out of which 12,123,100.06  lei non-refundable amount

Implementation period

2012-November 2014

Project completion date 

10.11.2014

Results

Rehabilitation of the urban public infrastructure in the historical area of Constanţa Municipality by: Repairs and restoration of support walls, guard rail; Arrangement of promenade alley; Modernisation of pedestrian alleys in the park and arrangement of green areas; Urban furniture (kiosks, gazebos, benches, fountains and drinking fountains, lighting poles).


10. IMPROVE ACCESS TO THE MAMAIA RESORT BY BUILDING PEDESTRIAN WALKWAYS

Financing source

Regional Operational Programme 2007-2013–Axis 1.1.

Beneficiary

Administrative Territorial Unit Constanța Municipality

Financing contract

3256/23.07.2012

Contract value

11,067,838.24 lei, out of which 8,392.273.32 lei non-refundable mount

Implementation period

2012 - June 2014

Project completion date 

23.06.2014

Results 

Three pedestrian catwalks located in the areas: Vacation Village, Casino and Rex.


11. “RESTORATION AND INTEGRATED RE-ARRANGEMENT OF THE HISTORICAL AREA – OVIDIU SQUARE”

Financing source

Regional Operational Programme 2007-2013 - Axis 1.1.

Beneficiaries

Administrative Territorial Unit Constanţa Municipality

Financing contract

3031/10.05.2012

Total value of the project

10,581,294.13 lei, out of which 8,494,477.56 lei non-refundable amount

Implementation period

May 2012 - May 2014

Project completion date 

10.05.2014

Results 

Rehabilitation of the degraded urban public infrastructure of the Historical Centre of Constanța Municipality by rehabilitating the following objectives: Ovidiu Square; Streets: Vasile Canarache, Marcus Aurelius and Aleea Vasile Canarache; 
Access stairs:
a) from Marcus Aurelius Street to Tomis Port;
b) Vasile Canarache Steet to Termele Romane Street;
Urban furniture: benches, lighting poles, garbage cans, ashtrays.
Rain water sewerage; Public lighting system; Green areas - embankments.


12. CONSTANȚA, FIRST STEP OF YOUR LONG JOURNEY – PROMOTING THE CONSTANȚA MAMAIA TOURISTIC AREA

Financing source

Regional Operational Programme 2007-2013 - Axis 1.1.

Beneficiaries

Administrative Territorial Unit Constanţa Municipality

Partners  Black Sea / Danube Delta Tourism Promotion Association 

Financing contract

1375/05.04.2011

Contract value

1,036,640 lei 

Implementation period

2011-2013

Project completion date 

04.04.2013 

Objective 

Valorisation of the cultural, historical and natural heritage of the Constanța – Mamaia touristic area, extending the general perception of “vacation in the sun at the seaside” to “knowledge vacation”, on three touristic topics: 
Knowledge tourism;
Historical, architectural and religious cultural tourism;
Recreational, nature and biodiversity tourism.  

Results 

1,640.000 flyers;
4,000 brochures;
Creating the web-site: www.constanta-turistica.ro


13. “GREEN PARKING – BUILDING A MULTILEVEL PARKING IN THE CONSTANȚA COUNTY EMERGENCY CLINICAL HOSPITAL AREA, CONSTANȚA COUNTY”
Financing source

Regional Operational Program 2007-2013- Axis1.1.

Beneficiaries Constanta Municipality

Financing contract

1517/20.04.2011

Total value of the project

12,186,543.36 lei, out of which 11,942,812.49 lei non-refundable amount

Implementation period

April 2011-September 2012

Project completion date

20.09.2012

Results

265 parking spaces were created


14. “REHABILITATION OF THE RETIREMENT HOME – UTILITIES AND CANTEEN BUILDING”
Financing source

Regional Operational Programme 2007-2013 - Axis 3.2.

Beneficiary

Administrative Territorial Unit Constanţa Municipality

Partner

Retirement home in Constanța

Financing contract

611/29.01.2010

Total value of the project

3,189,125.29 lei, out of which 1,725,465.91 lei non-refundable amount 

Implementation period

January 2010-April 2011

Project completion date

20.04.2011

Results

Installation replacement (telephone, fire signalling , intercom);
Trim restoration;
Heating installation replacement;
Electrical, sanitary, ventilation installation replacement in the canteen and laundry room;
Equipment with food preparation facilities;
Equipment with laundry room facilities.


15. “REHABILITATION OF THE RETIREMENT HOME IN CONSTANȚA”
Financing source

Regional Operational Programme 2007-2013 - Axis 3.2.

Beneficiary

Administrative Territorial Unit Constanţa Municipality

Partner

Retirement home in Constanța

Financing contract

33/20.02.2009

Total value of the project

2,885.820.69 lei, out of which  2.823,635.81 lei non-refundable amount

Implementation period

February 2009-February 2010

Project completion date

20 February 2010

Results

Restoration of bathrooms; restoration of the existing electrical installations;
Rehabilitation of elevators;
Restoration of the existing terrace by replacing the cover;
New building for water pumping system;


16. EUROPEAN ADMINISTRATION 
Financing source

PODCA 2007-2013 – Axis 1

Beneficiary
Constanta Municipality

Partners  Intercommunity Development Association "Constanta Metropolitan Area"
Financing contract 384780/17.03.2009
Contract value 248.746,20 lei, nonrefundable: 228.320,4 lei 
Timeframe project 2009-2010
Completion date 17.03.2010
Results

150 trained civil servants, who operate in the 14 municipalities of the cities that make up the metropolitan area of Constanta, in the fields of project management, public procurement, human resources, social and civic competences and internal audit.


17. SUSTAINABLE OPERATIONAL PARTENERSHIP (POD) CONSTANȚA-DOBRICH
Financing source

Program CBC RO-BG 2006 – Priority  4 “People to people”

Beneficiary Constanta Municipality
Partner  Dobrich Municipality
Financing contract RO2006/018-405.01.04.19
Contract value 43.519 euro,  nonrefundable: 35.359 euro 
Timeframe project 2008-2009
Completion date 2009
Results

25 civil servants from Constanta Metropolitan Area and Dobrich District were trained in the fields of project cycle management; rules and procedures on the Structural Funds and the peculiarities of cross-border cooperation;
A portfolio of projects that can be implemented within the Operational Programme CBC Romania - Bulgaria 2007-2013;
A permanent working group composed of civil servants participating at the training.


18. REGIO-LLL  
Financing source

Leonardo da Vinci Programe- Networks section

Beneficiary FREREF – Fondation des Regions Europeennes pour la Recherche en Education et en Formation
Partners  Constanta Municipality; Andaluza Fondo de Formacion y Empleo Foundation – Sevilla (Spain); Generalitat de Catalunya – Departament D’EDUCACIÓ – Barcelona (Spain); Servei d’ocupació de Catalunya. Department de Treball – Barcelona (Spain); Confédération Française des Travailleurs Chrétiens – CFTC Rhône – Alpes – Lyon (France); Chambre des Métiers et de l’Artisanat du Rhône – CMA 69 – Lyon (France); Centre National de la Recherche Scientifique – CNRS – Paris (France); Conseil Régional de Lorraine – Metz ( France); Conseil Régional de Rhône – Alpes – CHARBONNIERES LES BAINS (France); Université de Bretagne Sud – Lorient (France); Agenzia Regionale Istruzione Formazione Lavoro – Regione Lombardia – Milan (Italy); Centro Interateneo per l’Innovazione, la ricerca didattica e la formazione avanzata – Venice (Italy); Ministère de l’Education et de la Formation professionnelle du Grand-duché de Luxembourg/Service de la Formation professionnelle – Luxemburg; Województwo Małopolskie- Cracow (Poland); Conférence Intercantonale de l’Instruction Publique de la Suisse romande et du Tessin –Neuchatel. 
Financing contract 2007-1985/001-001
Contract value 623.568 euro, nonrefundable
Timeframe project 2007-2010
Completion date 2010
Results

Papers, essays and case studies on promoting the transfer of best practices across interregional levels and policy implementation "Lifelong Learning", according to the Lisbon Strategy.


19. PHARE CBC „ECO”
Financing source PHARE CBC 2005 Programe – People to People
Beneficiary Constanta County School Inspectorate
Partners  Constanța Municipality; Dobrich Municipality
Associations  S.C. Gremlin Computers S.R.L.; EcoRomAmbalaje; MM Recycling; Eco Dobrogea; Eco ZOO Dobrich
Contract value 54.870 euro, nonrefundable
Timeframe project 2007-2008
Completion date 2008
Results

Environmental awareness among students;
Selective collection of packaging waste by the schools from Constanta and Dobrich, ecological summer camp.


20. BLACK SEA tOURISM
Financing source PHARE CBC 2005 Program – People to People
Beneficiary Travel agencies in Romania; citizens of the region Dobrich and Constanta County; tourists
Partners Constanța Municipality; Dobrich Municipality
Financing contract RO2005/017-535.01.03.09
Contract value 53.256 euro,  nonrefundable: 47.930,4 euro
Timeframe project 2007-2008
Completion date 2008
Results

A study on the current situation of the seaside tourism in Romania and Bulgaria;
Setting up an association for the development and promotion of tourism at the Black Sea, in order to strengthen relations of cooperation in tourism between the regions of Dobrich and Constanta (Bulgaria);
It was awarded by the European Commission in the final conference Concertour draft - Accessibility, Strategies, Solutions and Services for improving the European Sustainable Tourism, held in Rome on 25.09.2009.


21. uRBAMECO 
First stage
Financing source URBACT I 2002-2006 Programme
Beneficiary Grand Lyon (France)
Partners Constanța Municipality; Goteborg Municipality, Sweden; Birmingham Municipality, Great Britain; Belfast Municipality , Ireland; Arnhem Municipality, Holland; Lodz Municipality, Poland; Pila Municipality, Poland; Wroclaw Municipality, Poland; Nea Ionia Magnesias Municipality, Greece.
REF 1750/FT
Contract value 98.100 euro,  nonrefundable
Timeframe project 2007-2008
Completion date 2008
Results

Local Action Plans, case studies, best practice recommendations

Second stage  
Financing source URBACT II 2007-2013 Programme
Beneficiary Grand Lyon (France)
Partners Constanța Municipality; Goteborg Municipality, Sweden; Birmingham Municipality, Great Britain; Belfast Municipality , Ireland; Arnhem Municipality, Holland; Lodz Municipality, Poland; Pila Municipality, Poland; Wroclaw Municipality, Poland; Nea Ionia Magnesias Municipality, Greece.
REF 1750/FT
Contract value 594.975 euro, nonrefundable: 542.500 euro
Timeframe project 2008-2009
Completion date 2009
Results Local Action Plans, case studies, best practice recommendations

22.  iMAPS
Financing source INTERREG III C PROGRAMME
Beneficiary Brest Urban Community, France
Partners

Constanța Municipality; Technology Park Brest, France; Department of Fire and Emergency Situations, Brest, France; Matosinhos Municipality, Portugal; Institute of Water Northern Region, Matosinhos, Portugal; Taranto Municipality, Italy; Autoritatea Portuară, Taranto, Italia; Ovidius University, Constanța; Local Council Cadiz, Spain; Cadiz Univerity, Spain; Port authority Gijon, Spain; Local Council Isle of Wight, United Kingdom

Contract value 992.000 euro, nonrefundable: 979.500 euro
Timeframe project 2005-2007
Completion date 2007
Results

Creating a network of exchanges between the port cities facing similar problems.


23. E-PMC
Financing source PHARE 2002 - PROGRAMME
”The modernization fund for the development of local government and local budget”
Beneficiary Constanța Municipality
Financing contract RO2002/000-586.03.02
Contract value 40.000 euro, nonrefundable: 38.000 euro
Timeframe project 2004-2005
Completion date 2005
Results

Modernization of document management and operational management by implementing the electronic signature system.


24. CLEANER PRODUCTION AND ENERGY EFFICIENCY
Financing source Government of Norway
Beneficiary Economic operators from the city and county of Constanta
Partners Constanța Municipality; Norwegian Energy Efficiency Group; The Norwegian Society of Chartered Technical and Scientific Professionals; Pollution Prevention Center in Bucharest
Contract value 100.000 euro nonrefundable
Timeframe project 2004-2005
Completion date 2005
Results

On-land training; training  for Romanian instructors; Manuals on quality management and environmental management 


25. TAPESTRY
Financing source General Directorate for Energy and Transport of the European Commission (DGTREN)
Beneficiary Direct autonomous transport – Constanța Municipality 
Partners Transport and Travel Research Ltd., United Kingdom; Transport Studies Group, University of Westminster, United Kingdom; Hampshire County Council, United Kingdom; Herdfordshire County Council, United Kingdom; Langzaam Verkeer, Belgium; TISPT Consultores Em Transportes Inovacao e Sistemas SA, Portugal; Aristotle University of Thessaloniki, Greece; Asstra-Associatione Transporti, Italy; Citta di Torino, Italy; Romanian Union of Public Transport, Romania; Constanța Municipality, Romania; Interactions Ltd, Irland; Communaute Urbaine de Nantes, France; T.E.Marknadskommunikation A.B., Sweden
Contract value 3000.000 euro, nonrefundable
Timeframe project 2001-2002
Completion date 2002
Results

Development and implementation of case studies in areas such as:
1. Intermodal transportation;
2. Repositioning of the public transport;
3. Health and Environment.